Predict your next investment

HNTB company logo
INDUSTRIAL | Construction / Construction & Design Services
hntb.com

See what CB Insights has to offer

Founded Year

1914

About HNTB

HNTB is an employee-owned infrastructure solutions firm. HNTB understands the life cycle of infrastructure and addresses clients' most complex technical, financial and operational challenges. Professionals deliver a full range of infrastructure-related services, including planning, design, program and construction management.

HNTB Headquarter Location

United States

Latest HNTB News

GIS and BIM Take First Major Steps to Integration

Sep 1, 2021

Bringing everything from utilities information to site conditions out of a GIS map into a BIM usually requires cumbersome rework. That's now changing. A point cloud with LiDAR data of buildings, roads and utilities was taken to inform HDR’s BIM 360 project informationsharing platform for the Ontario Line project. Lidar Point Cloud Courtesy of HDR September 1, 2021 Geographic Information Systems and Building Information Modeling have developed side-by-side over a period of more than three decades, with civil engineers, architects and contractors using both types of data to better inform airport, transit, road and even general building projects. Despite these parallels, the twain have never met over those years of development. GIS captures and creates opportunity for analysis of spatial and geographic information, while BIM, with its related parameters focused on a building’s tolerances and construction phasing, captures the interactions of a building and its infrastructure. Autodesk and Esri—the company that invented Geomapping in the 1960s and has been the dominant player in GIS technology from its Redlands, Calif., campus—announced a new partnership in 2017 on workflows linking GIS and BIM. At its user conference in June this year, ESRI showed off a new product: ArcGIS GeoBIM. As the dominant GIS vendor, it’s a significant move for Esri to say it has built a web portal for connecting ArcGIS to Autodesk Construction Cloud. Even though it’s just the beginning of the integration, such GIS-to-BIM workflows could eliminate the wholesale recreation of data from one system to the other that is currently required, a problem that has generated mountains of repetitive work for virtual design and construction departments over the years. John Tocci, Jr., VDC manager at PCL Construction Services in Los Angeles, ran up against the quirky U.S. survey ft, a standard unit of measurement common among surveyors, when he was starting work on the Consolidated Rent-A-Car facility for Los Angeles International Airport’s Landside Access Modernization Program. All of the survey data on the airport’s land was listed in survey ft, a measurement first adopted by the U.S. in 1866, which specifies that one meter is equal to 39.37 in. and 1,200 m is equal to 3,937 ft. To convert survey ft to meters, Tocci and his team had to divide those two numbers. “You come out with a decimal that has 10 places [.3048006096],” he says. “The U.S. survey foot is different from the decimal foot, because with the decimal foot, they just kind of truncated it to 0.3048.” Tocci says that what ended up happening was, since the survey ft doesn’t match up with a decimal ft but isn’t really used outside of surveying, the Autodesk software they used couldn’t handle the conversion. “You end up with a shared coordinate system that’s actually inaccurate when you’re round-tripping data, just assuming a foot of one sort is the same as a foot of another sort, when your shared coordinate system is based on your survey coordinates,” he says. The only answer at the time was recreating all of those coordinates for the project in decimal ft. The survey ft was finally added as a unit of measurement in Revit and Civil 3D last year. But ArcGIS GeoBIM goes beyond just resolving small issues like that, and is the result of years of work. Autodesk and Esri have worked on open APIs and better data sharing, but ArcGIS GeoBIM is the first product that engineers from both vendors worked on together, blending survey and design workflows. The web-based service is still being tested ahead of its launch later this year, but ENR spoke with several engineers testing it who said its workflow, so far, is an important first step in bringing about a better GIS-to-BIM data experience. HNTB’s 5D digital twin for Jamaica Station allows vertical and horizontal views, highlights staging areas and lets them be used as a spatial bookmark. Screenshots courtesy of HNTB “What we’re trying to create is a single source of truth access point for anyone on the team to see the latest design information, whether that’s coming from 2D civil [bird’s-eye view] as well as the 3D design aspects, which all need to be visualized in 3D vertically,” says Darin Welch, HNTB associate vice president and national geospatial and virtual engagement manager. “We need a way to see horizontal and vertical in a way that brings all of that information together in that single source of truth.” Both horizontal and vertical views are needed for projects such as rail lines, train stations and airports since they show how a whole system interacts while also offering detail on individual components, such as stations and platforms. GIS and BIM data both have roles to play in this comprehensive view. For the Long Island Rail Road’s Jamaica Station capacity improvements project, Welch and his team at HNTB put on their programmer hats and built a 5D digital twin that had design, schedule and cost estimates for the 10 main stages of the project and 29 sub-stages. The 5D model brought together data from 3ds Max, ArcGIS CityEngine, Microsoft Project, Microsoft Excel, Esri’s Javascript API and other sources. It was a lot of work, but the Jamaica Capacity Improvements Virtual Design and Construction Explorer has helped HNTB keep the project on schedule for completion later this year. “We need to see horizontal and vertical in a way that brings all of that information together.” Darin Welch, associate vice president and national geospatial and virtual engagement manager at HNTB HNTB is the lead heavy civil engineer on part of the expansion of O’Hare International Airport in Chicago. The engineer is designing a central tunnel system for utilities, baggage and passengers. The total cost of the project is expected to be $1.4 billion. “The passenger tunnel is the one that we have been kind of slated to prototype our ArcGIS GeoBIM early adoption,” Welch says. He says there is less dependency on 4D and 5D modeling on that project than on Jamaica Station, but more reliance on how HNTB pulls together source files from multiple consultants and contractors, along with the 3D BIM data. Airport officials have discussed bringing all project data into a single visualization product for coordination and clash detection. “This is a new underground tunnel,” Welch says. “It’s a pretty extensive underground utility at work at an airport.” Welch explains that HNTB and the Chicago Department of Aviation have already determined the general tunnel location and are now refining functions and placements. “They have a Point A and Point B but we’re figuring out how it’s laid out in between and how we will allocate the spaces for cargo transfer versus passenger and intermix, all of that with minimal impact to things like utilities.” After using ArcGIS GeoBIM, Welch sees it as a positive development for establishing a connection between GIS and BIM. “You are connecting directly to Autodesk Construction Cloud’s BIM 360 from ArcGIS Pro, or Autodesk Civil 3D is connecting directly to ArcGIS online or enterprise directly to those managed data services,” he says. “Where we aren’t quite [at] yet is being able to have that same true integration without translation [of the data]. That is not on the web yet. The promise, for us in ArcGIS GeoBIM is it’s the first really strong step toward true web integration.” Another complex infrastructure project that required robust data from both GIS and BIM is HDR’s design of the $8.2-billion Ontario Line transit system in Toronto. As technical advisor, HDR was responsible for 10 miles of subway, 15 stations, 3D clash detection and project management, models to support 4D phasing, and comprehensive GIS portals that dynamically integrate 2D and 3D design data. ArcGIS GeoBIM lets engineers and VDC managers simultaneously view a building model and its attached information alongside a GIS map with its assets and 3D data. Screenshots courtesy of ESRI and HDR HDR’s BIM 360 common data environment shows project progress on a weekly basis, including design progression that integrates a 2D design layout and 3D information to help designers and contractors better contextualize how information fits together. It is currently composed of more than 320 design models and is expected to contain more than 400 by the time of  its completion in 2027. “I think we’re at just over four terabytes now of reality capture data specific to point clouds,” says Cameron Schaefer, transportation data acquisition and reality mesh director at HDR. “We’ve got underground stations, we’ve got above-ground stations, we’ve got all forms of LiDAR data whether it’s aerial LiDAR, helicopter LiDAR, mobile LiDAR and terrestrial LiDAR.” HDR’s BIM 360 solution has a 3D GIS viewer of vertical and architectural models and an integration of  reality meshes from its LiDAR sources that puts every part of the project into context. “It’s one thing to bring the 3D models into a GIS environment where you’re looking at a generally flat, traditional, at-grade surface, but you’re not getting the full context and the accuracy of the buildings or of the drainage,” Schaefer says. “Let’s have the streetlights and the guy wires. You’re seeing all of that collectively when you bring in the high-resolution point cloud data.” Using the BIM 360 cloud connection tool lets HDR dynamically connect and pull data from GIS. Schaefer has also tested ArcGIS GeoBIM and thinks it opens up new possibilities. “GeoBIM does fundamentally take all those capabilities from an ArcGIS scene,” he says. “You’ve got that on the left side of your screen. And then it ports on the right side of your screen, [in] the BIM 360 large model viewer.” Schaefer says this allows the user to see the data layers and levels of a 3D model. “You’re really getting down into the metadata that is structured within Autodesk Civil 3D or a Revit model, as it is intended within that native platform versus the comparable tool within a scene.” Currently ArcGIS Pro offers “scenes,” a way of tilting up 2D maps and presenting some associated 3D model information. Schaefer calls it a “semi-helpful tool” that allows a user a limited way to view 3D models in ArcGIS Pro, but it doesn’t allow a user to dive into the data of a 3D parametric model. For downstream users, GeoBIM gives them both environments, Schaefer said. It offers the simplified GIS version, and for buildings, utility tunnels and other components that have BIM information attached, a user can open the model, search property set names and connect to what’s available in BIM 360 in the same workflow. “I could have a scene open on one screen and I could have BIM 360 open on another,” Schaefer says. “It would be very similar to the functionality that GeoBIM has. The difference is that I would have to search through a folder hierarchy on BIM 360 each time, rather than visually [navigate]. I’d have to find a model. I’d have to hunt through folders to find that model.” “[Without ArcGIS GeoBIM], I’d have to find a model. I’d have to hunt through folders to find that model.” Cameron Schaefer, transportation data acquisition and reality mesh director, HDR For Esri and Autodesk, this partnership means integration of more than just their data. The two vendors have been working together since 2016 on broader interoperability as well. “We had divested from a product called Autodesk Utility Design in 2016,” says Theo Agelopoulos, senior director of architecture and engineering design strategy at Autodesk. “That that was kind of when we were beginning to focus more on what is our core business, which is really around designing, building.” Chris Andrews is group product manager of geo-enabled systems and SmartCities/3D at Esri, but he previously worked in cloud services at Autodesk. In 2016 he and Agelopoulos got their respective CEOs (Carl Bass at Autodesk and Jack Dangermond at Esri) together and came up with a three-phase plan that began with the product integrations between ArcGIS Pro, Revit and Civil 3D. The next phase, Agelopoulos says, was around connecting the companies’ products not just into each other’s data, but also connecting them from a product-to-cloud or product-to-enterprise database perspective. “An IFC model is a database with 700 tables all its own,” says Anthony Renteria, Esri’s product manager for ArcGIS GeoBIM. “And then a GIS can have hundreds of tables storing other types of information about assets. It’s more about using both to do something that simply wasn’t possible in any other way in the past.” More than 300 models and several different types of LiDAR scanes were integrated into HDR’s BIM 360 visual representation of the Ontario Line project in Toronto. BIM Integrated Project Map courtesy of HDR Andrews says the first two years of the Autodesk-Esri partnership were really about both vendors proving they could do this, shifting product road maps so they could even begin to align. Connectors, points where data could be shared across databases and cloud infrastructure by both companies, were identified and work began on proper integration. “Just bringing a layer into an application, that’s been possible since the connectors effort started,” Andrews says. Development hastened over the years to the point where ArcGIS GeoBIM was possible as an actual service, the third phase of the partnership. “Seeing the project in context with adjacencies—whether it’s additional buildings or utility lines around the site—[and] being in coordination with those constantly allows you to visualize this information within a web browser,” Renteria says. “That was game changing. You’re not just using it internally for internal coordination purposes, but also opening that up to discussions with other teams as well.”

Predict your next investment

The CB Insights tech market intelligence platform analyzes millions of data points on venture capital, startups, patents , partnerships and news mentions to help you see tomorrow's opportunities, today.

HNTB Patents

HNTB has filed 39 patents.

The 3 most popular patent topics include:

  • Structural engineering
  • Structural system
  • Bridges
patents chart

Application Date

Grant Date

Title

Related Topics

Status

11/8/2017

4/21/2020

Structural system, Structural engineering, Bridges, Digestive system, Construction terminology

Grant

00/00/0000

00/00/0000

Subscribe to see more

Subscribe to see more

Subscribe to see more

00/00/0000

00/00/0000

Subscribe to see more

Subscribe to see more

Subscribe to see more

00/00/0000

00/00/0000

Subscribe to see more

Subscribe to see more

Subscribe to see more

00/00/0000

00/00/0000

Subscribe to see more

Subscribe to see more

Subscribe to see more

Application Date

11/8/2017

00/00/0000

00/00/0000

00/00/0000

00/00/0000

Grant Date

4/21/2020

00/00/0000

00/00/0000

00/00/0000

00/00/0000

Title

Subscribe to see more

Subscribe to see more

Subscribe to see more

Subscribe to see more

Related Topics

Structural system, Structural engineering, Bridges, Digestive system, Construction terminology

Subscribe to see more

Subscribe to see more

Subscribe to see more

Subscribe to see more

Status

Grant

Subscribe to see more

Subscribe to see more

Subscribe to see more

Subscribe to see more

HNTB Web Traffic

Rank
Page Views per User (PVPU)
Page Views per Million (PVPM)
Reach per Million (RPM)
CBI Logo

HNTB Rank

CB Insights uses Cookies

CBI websites generally use certain cookies to enable better interactions with our sites and services. Use of these cookies, which may be stored on your device, permits us to improve and customize your experience. You can read more about your cookie choices at our privacy policy here. By continuing to use this site you are consenting to these choices.